TAUNTON- BRIDGE REPLACEMENT, T-01-015, WASHINGTON STREET (SR 140) OVER THE MILL RIVER
The proposed bridge consists of replacing the existing two-span continuous steel stringer bridge carrying Washington Street over the Mill River in Taunton with a single span precast concrete beams superstructure. The existing abutments will be utilized if possible or integral abutments will be constructed behind the existing abutments. The proposed bridge, as per town request, shall be investigated with four eleven foot lanes, compared to the existing two lanes.
Location:
  • City of Taunton
  • Resident Engineer: Eric Borman
    Construction Contract Value: $4,988,996.65
    Construction Bid Price: $4,127,078.61
    Initial Construction Estimate: $4,591,789.00
    District: District 5

    Contracts (3) Progress
    # 64303 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 77847 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 79296 -- Construction Contract
    Bridge Replacement (T-01-015) (Steel) - Route 140 (Washington Street) over the Mill River. (ABP) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 12/13/2013
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/02/2008
    Project Initiation Form PIF Entered 02/03/2009
    Project Initiation Form PRC Submitted 02/03/2009
    Project Review Committee PRC Approved 02/12/2009
    Project Review Committee Letter 09/10/2009
    Project Status Advertised 08/17/2013
    Project Management
    25% Design 25% Package Received 04/05/2012
    25% Design 25% Package Comments to DE 05/22/2012
    25% Design Design Public Hearing 11/15/2012
    75% Design 75% Package Received 02/19/2013
    75% Design 75% Package Comments to DE 05/17/2013
    Final Design PS&E Received 06/28/2013
    Final Design PS&E to FAPRO 08/13/2013
    Consultant Contract Process Scope to DE 04/14/2011