Project Description: |
UXBRIDGE- BRIDGE REPLACEMENT, U-02-041, ST 146 (NB) OVER THE MUMFORD RIVER
Bridge rehabilitation U-02-041, state route 146 North Bound over the Mumford River
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Tracy O Osimboni |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|