Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
WEST BRIDGEWATER- BRIDGE REPLACEMENT, W-18-012, ROUTE 106 (WEST CENTER STREET) OVER THE HOCKOMOCK RIVER
The existing stone arch and reinforced concrete arch carrying West Center Street over the Hockomock River are anticipated to be replaced with a single span superstructure of approximately 65 feet. The superstructure system of first choice is a precast arch.
Location:
  • Town of West Bridgewater
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Stephen Soma
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • W18012 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project