| Project Description: |
WEST BRIDGEWATER- BRIDGE REPLACEMENT, W-18-012, ROUTE 106 (WEST CENTER STREET) OVER THE HOCKOMOCK RIVER
The existing stone arch and reinforced concrete arch carrying West Center Street over the Hockomock River are anticipated to be replaced with a single span superstructure of approximately 65 feet. The superstructure system of first choice is a precast arch.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Stephen Soma![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|