LOWELL- HAMILTON CANAL WALKWAY CONSTRUCTION & REHAB OF L-15-100 (RAILROAD PEDESTRIAN BRIDGE)
The project includes the conversion of an existing trolley bridge into a pedestrian bridge over Swamps Locks Basin in Lowell. Historic bridge railing will be installed as part of the bridge work. Also included in the project is the construction of a walkway along Hamilton Canal between Thorndike Street and Revere Street.
Location:
  • City of Lowell
  • Resident Engineer: Daniel Boland
    Construction Contract Value: $2,209,380.00
    Construction Bid Price: $1,986,755.00
    Initial Construction Estimate: $2,075,367.75
    District: District 4

    Contracts (2) Progress
    # 54827 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 61345 -- Construction Contract
    Hamilton Canal Walkway Construction Including Rehabilitation of (L-15-100) (Railay Pedestrian Bridge). Completed

    Bridges

    Contract Dates
    Notice to Proceed: 02/16/2010
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/08/2008
    Project Initiation Form PIF Entered 09/09/2008
    Project Initiation Form PRC Submitted 09/30/2008
    Project Review Committee PRC Approved 11/06/2008
    Project Review Committee Letter 11/19/2008
    Project Status Advertised 09/19/2009
    Project Management
    100% Design 100% Package Received 07/24/2009
    100% Design 100% Package Comments to DE 08/18/2009
    25% Design Design Public Hearing 05/19/2009
    75% Design 75% Package Received 04/08/2009
    75% Design 75% Package Comments to DE 06/09/2009
    Final Design PS&E Received 09/10/2009
    Final Design PS&E to FAPRO 09/16/2009