| Project Description: | LOWELL- HAMILTON CANAL WALKWAY CONSTRUCTION & REHAB OF L-15-100 (RAILROAD PEDESTRIAN BRIDGE) The project includes the conversion of an existing trolley bridge into a pedestrian bridge over Swamps Locks Basin in Lowell. Historic bridge railing will be installed as part of the bridge work.  Also included in the project is the construction of a walkway along Hamilton Canal between Thorndike Street and Revere Street. | 
| Location: |  | 
| Resident Engineer: | Daniel Boland  | 
| Construction Contract Value: | $2,209,380.00 | 
| Construction Bid Price: | $1,986,755.00 | 
| Initial Construction Estimate: | $2,075,367.75 | 
| District: | District 4 | 
| 
 | Bridges
 | ||||||||||||||
| 
 | ||||||||||
| 
 | 
| 
 | 
| 
 
 
 | |||||||||||||||||||||||||||||||||||||||||||||||