| Project Description: |
AGAWAM- WEST SPRINGFIELD- BRIDGE REPLACEMENT, A-05-002=W-21-014, ROUTE 147 OVER THE WESTFIELD RIVER & INTERSECTION & SIGNAL IMPROVEMENTS @ 3 LOCATIONS
The purpose of this project is to reconstruct/widen the Rte 147 Bridge over the Westfield River along with intersection reconstruction and new traffic signals at 3 adjacent locations (including connecting roadway) is required to relieve congestion.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Project Manager: | Alwin Ramirez![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||