Project Description:
|
FOXBOROUGH- BRIDGE PRESERVATION, F-06-015, I-95 OVER GREEN STREET
The work for Bridge No. F-06-015 (3QK & 3QL) shall consist of removing the existing bridge superstructures and replacing with new superstructures complete with new decks and barriers. The new superstructures shall accommodate three lanes of traffic in their respective directions. No widening of the existing roadway is anticipated, except as may be required for lane and shoulder widths to meet current standards. The new structures will not have sidewalks. It is intended that work will be completed in as few days as possible. Therefore, accelerated construction techniques shall be utilized.
|