Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
FOXBOROUGH- BRIDGE PRESERVATION, F-06-015, I-95 OVER GREEN STREET
The work for Bridge No. F-06-015 (3QK & 3QL) shall consist of removing the existing bridge superstructures and replacing with new superstructures complete with new decks and barriers. The new superstructures shall accommodate three lanes of traffic in their respective directions. No widening of the existing roadway is anticipated, except as may be required for lane and shoulder widths to meet current standards. The new structures will not have sidewalks. It is intended that work will be completed in as few days as possible. Therefore, accelerated construction techniques shall be utilized.
Location:
  • Town of Foxborough
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Joe D Bianchi
    Estimated Total Contract Cost: $1,733,742.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • F06015 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project