BUCKLAND- SHELBURNE- BRIDGE BETTERMENT, B-28-032=S-11-014, ROUTE 2 OVER ROUTE 112 & DEERFIELD RIVER
The proposed work on the bridges carrying Route 2 over Route 112 and the Deerfield River shall consist of removing the wearing surface and membrane waterproofing on the bridge; replacing the concrete deck slab; reconstructing the approach wearing surface; removing and replacing the bridge bearings railing; repairing deteriorated superstructure elements; repairing the existing substructure; and stripping and painting the steel.
Location:
  • Town of Buckland
  • Town of Shelburne
  • Resident Engineer: Stephen Eddington
    Construction Contract Value: $7,650,472.00
    Construction Bid Price: $6,647,375.00
    Initial Construction Estimate: $7,689,020.00
    District: District 1

    Contracts (3) Progress
    # 55039 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of structural evaluations and emergency design support services to support the Bridge Preservation/Betterment Advertisement Program. Final
    # 66664 -- Construction Contract
    Bridge Rehabilitation (B-28-032=S-11-014) (Steel) -Route 2 (Mohawk Trail) over Route 112 (Main Street) and the Deerfield River Completed
    # 77861 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

    Contract Dates
    Notice to Proceed: 12/10/2010
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/05/2008
    Project Initiation Form PIF Entered 11/05/2008
    Project Initiation Form PRC Submitted 11/05/2008
    Project Review Committee PRC Approved 11/06/2008
    Project Status Advertised 07/31/2010
    Project Management
    100% Design 100% Package Comments to DE 09/25/2009
    75% Design 75% Package Received 08/05/2009
    Final Design PS&E Received 11/02/2009
    Final Design PS&E to FAPRO 07/22/2010