| Project Description: |
HAVERHILL- DECK REPLACEMENT, H-12-057, WARD HILL CONNECTOR OVER FERRY ROAD & RAILROAD (ABP-PR25)
The Haverhill bridge project includes both eastbound and westbound bridges on Ward Hill Connector over the Ferry Road and the MBTA and B&M Railroads. Work consists of excavating, removing and replacing the existing deck including all pavement and concrete, existing safety walk, existing railing, and partial excavation and repair of the sub-structural components.
|
| Location: | |
| Resident Engineer: | Thomas Zizza![]() |
| Construction Contract Value: | $2,968,649.00 |
| Construction Bid Price: | $2,197,956.00 |
| Initial Construction Estimate: | $3,172,950.00 |
| District: | District 4 |
|