Project Description: |
DISTRICT 5- INTERSTATE DECK REPAIRS AT VARIOUS LOCATIONS (ABP-PR28)
The work to be done under this Contract consists of scheduled and emergency deck repairs performed on bridges within District Five (5) which will include partial depth and/or full depth excavation of the existing reinforced cement concrete deck where deterioration has occurred.
|
Location: | |
Resident Engineer: | John Bielski |
Construction Contract Value: | $1,800,000.00 |
Construction Bid Price: | $664,177.00 |
Initial Construction Estimate: | $1,618,950.00 |
District: | District 5 |
|
Bridges |
|
|
|
|