Project Description:
LYNN- REVERE- ELECTRICAL/MECHANICAL REPLACEMENT AND STRUCTURAL REPAIRS ON L-18-015=R-05-08, ROUTE 1A OVER THE SAUGUS RIVER (GENERAL EDWARDS DRAWBRIDGE)
The General Edwards Drawbridge is located on North Shore Road (Route 1A) over the Saugus River in Lynn/Revere. The proposed project consists of the repair/replacement of electrical and mechanical operating machinery of the drawbridge, rehabilitation and architectural repairs to the operator’s rooms and tower, miscellaneous granite repairs, and various structural steel repairs. Traffic lane closures or detours are not expected to be required. The drawbridge will not be operational (unable to be raised) for several months during the winter.
Location:
  • City of Lynn
  • City of Revere
  • Resident Engineer: Elias Demissie
    Construction Contract Value: $10,283,668.00
    Construction Bid Price: $8,618,407.00
    Initial Construction Estimate: $8,555,043.00
    District: District 4

    Contracts (3) Progress
    # 57464 -- Design -- Bridge Open End
    Work will consist of providing engineering design, review and construction management services on a task order basis. Final
    # 64310 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 68165 -- Construction Contract
    General Edwards Drawbridge Rehabilitation (Including Electro-Mechanical Work) (L-18-015=R-05-008) (Steel) - Route 1A (North Shore Road) over the Saugus River (ABP) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 07/19/2011
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/21/2008
    Project Initiation Form PIF Entered 11/21/2008
    Project Initiation Form PRC Submitted 03/03/2010
    Project Review Committee PRC Approved 05/13/2010
    Project Review Committee Letter 06/08/2010
    Project Status Advertised 09/18/2010
    Project Management
    100% Design 100% Package Received 08/10/2010
    Final Design PS&E Received 08/10/2010
    Consultant Contract Process NTP Issued 12/01/2007