Project Description:
SOMERVILLE- DECK & SUBSTRUCTURE REPAIRS, S-17-039, ROUTE 28 OVER WASHINGTON STREET (MCCARTHY OVERPASS)
The expected work for this project shall consist of, but not be limited to the following: • The joints shall be replaced with link-slab where applicable and replaced with strip seal joint where link-slab is not possible. Using link-slab will require both adjacent bearings to be expansion. If bearings need to be replaced, elastomeric bearing pads shall be used. • Some substructure patch work has already been done. The consultant shall investigate all concrete further for additional repairs. • The concrete substructure shall be sounded for integrity. Any delaminated and spalled area shall be excavated and prepared properly for concrete patching. Cracks shall be injected and sealed. • Structural steel shall be cleaned and painted. After the paint and rust are removed, if significant amount of section loss is observed, the consultant shall investigate the need of repair. • The inspection report indicated that some steel girders over bearings had cracks near the bottom at the web. Consultant shall investigate rather this is an isolated incident or rather it is a structural design detail that is causing the cracks. • Closed drainage system shall be cleaned, and all damaged piping shall be replaced. Due to the complex roadway layout under the bridge, the consultant shall carefully prepare a traffic management plan that incorporates all the work necessary for the bridge at all stages of construction. The consultant shall communicate with the locals early in design to avoid conflict.
Location:
  • City of Somerville
  • Resident Engineer: Michael Cannata
    Construction Contract Value: $14,177,606.00
    Construction Bid Price: $10,936,005.50
    Initial Construction Estimate: $10,995,553.85
    District: District 4

    Contracts (8) Progress
    # 54832 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of structural evaluations and emergency design support services to support the Bridge Preservation/Betterment Advertisement Program. Final
    # 54835 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of structural evaluations and emergency design support services to support the Bridge Preservation/Betterment Advertisement Program. Final
    # 57465 -- Design -- Bridge Open End
    Work will consist of providing engineering design, review and construction management services on a task order basis. Final
    # 68386 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide highway and bridge projects. Final
    # 69763 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various highway and bridge projects. Final
    # 71229 -- Construction Contract
    Bridge Rehabilitation (S-17-039) (Steel) - Route 28 over Washington Street (McCarthy Overpass). (ABP) Completed
    # 77868 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 77885 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

    Contract Dates
    Notice to Proceed: 06/12/2012
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/21/2008
    Project Initiation Form PIF Entered 11/21/2008
    Project Initiation Form PRC Submitted 07/28/2010
    Project Review Committee PRC Approved 08/12/2010
    Project Status Advertised 09/24/2011
    Project Management
    Final Design PS&E Received 08/10/2011
    Final Design PS&E to FAPRO 09/20/2011
    Consultant Contract Process Scope to DE 03/12/2010