| Project Description: |
BOSTON- FULL DECK REPLACEMENT, B-16-390, ROUTE 3A (MORRISSEY BOULEVARD) OVER NEPONSET RIVER (NEPONSET RIVER BRIDGE - PHASE II)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | Steven E McLaughlin![]() |
| Estimated Total Contract Cost: | $38,772,185.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||