Project Description:
NEWTON- WELLESLEY- BRIDGE REHABILITATION (PED), N-12-086=W-13-026, LOWER FALLS AT CONCORD STREET OVER CHARLES RIVER (P-40)
Rehabilitation of an abandoned railroad bridge over the Charles River in Newton and Wellesley for use as a pedestrian bridge and the construction of bridge approaches which include trail and amenities to the bridge. The approaches include a permanent bridge approach on the Newton side and an interim bridge approach on the Wellesley side of the bridge.
Location:
  • City of Newton
  • Town of Wellesley
  • Design Responsibility: In-House Boston
    Project Manager:
    Estimated Total Contract Cost: $555,330.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 6
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • N12086 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project