| Project Description: |
NEWTON- WELLESLEY- BRIDGE REHABILITATION (PED), N-12-086=W-13-026, LOWER FALLS AT CONCORD STREET OVER CHARLES RIVER (P-40)
Rehabilitation of an abandoned railroad bridge over the Charles River in Newton and Wellesley for use as a pedestrian bridge and the construction of bridge approaches which include trail and amenities to the bridge. The approaches include a permanent bridge approach on the Newton side and an interim bridge approach on the Wellesley side of the bridge.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Project Manager: | ![]() |
| Estimated Total Contract Cost: | $555,330.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||