| Project Description: |
NEWTON- WELLESLEY- BRIDGE REHABILITATION (PED), N-12-086=W-13-026, LOWER FALLS AT CONCORD STREET OVER CHARLES RIVER (P-40)
Rehabilitation of an abandoned railroad bridge over the Charles River in Newton and Wellesley for use as a pedestrian bridge and the construction of bridge approaches which include trail and amenities to the bridge. The approaches include a permanent bridge approach on the Newton side and an interim bridge approach on the Wellesley side of the bridge.
|
| Location: |
|
| Resident Engineer: | Kathryn Barr![]() |
| Construction Contract Value: | $555,330.00 |
| Construction Bid Price: | $474,200.00 |
| Initial Construction Estimate: | $700,000.00 |
| District: | District 6 |
|
Bridges
|
||||||||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||