Project Description:
PALMER- BRIDGE REPLACEMENT, P-01-024, PARK STREET (ROUTE 20) OVER CSX RR & BOSTON ROAD (ROUTE 67 NB) INCLUDING DEMOLITION
The partially completed original construction contract (Project #111309; contract #38898) to replace bridge P-01-024 has been terminated. This new project will complete the bridge construction and approach roadway work. The partially constructed new bridge is at approximately 60% of its design width. Demolition of the old bridge will be part of this project. Additional work to be completed under this project will include: the new bridge structure (partial), approach sidewalks and wheelchair ramps, earthwork, grading and a retaining wall on the unfinished side of the bridge, approach guardrail and signing. Roadwork will include tack coat and HMA top course in some locations, full depth reconstruction in others, along with granite curbing, berm, drainage installation and adjustment of drainage structures at various locations. Finish work will include loam and seed, slope paving under bridge, driveway modification, chain link fence, granite bound installation, pavement markings and resetting mailboxes.
Location:
  • Town of Palmer
  • Resident Engineer: Richard Wonderlie
    Construction Contract Value: $3,474,109.40
    Construction Bid Price: $2,858,262.00
    Initial Construction Estimate: $3,838,031.50
    District: District 2

    Contracts (3) Progress
    # 58213 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 64318 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 68026 -- Construction Contract
    Bridge Replacement (Including Demolition) (P-01-024) (Steel) – Park Street (Route 20) over Boston Road (Route 67 NB) and the CSX Railroad. Completed

    Bridges

    Contract Dates
    Notice to Proceed: 04/20/2011
    Contract Information
    Project Designer: In-House Boston
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/21/2008
    Project Initiation Form PIF Entered 11/21/2008
    Project Initiation Form PRC Submitted 06/23/2009
    Project Review Committee PRC Approved 08/13/2009
    Project Review Committee Letter 09/10/2009
    Project Status Advertised 11/27/2010
    Project Management
    100% Design 100% Package Received 10/02/2009
    Final Design PS&E Received 11/16/2010
    Final Design PS&E to FAPRO 11/22/2010