Project Description: |
GILL- ERVING- ORANGE- WENDELL- RESURFACING & RELATED WORK ON ROUTE 2
Work under this project will consist of milling the existing paved surface and repaving with 2" of HMA modified top course material. Work will also include repairs/upgrades to guardrail end treatments and sidewalk wheelchair ramps along with new pavement markings. The project limits are as follows: Route 2 from mm 52.9 to 56.59 for a length of 3.69 miles; Mohawk Trail from mm 60.21 to 63.76 for a project length of 3.55 miles.
|
Location: |
|
Resident Engineer: | Keith Laporte |
Construction Contract Value: | $3,325,234.20 |
Construction Bid Price: | $2,936,224.64 |
Initial Construction Estimate: | $3,268,154.43 |
District: | District 2 |
|
Bridges |
|
|
|
|