CUMMINGTON- RESURFACING & RELATED WORK ON ROUTE 9, FROM WINDSOR T.L. TO GOSHEN T.L.
The proposed pavement preservation measure for this project consists of micro-milling the roadway to an average depth of 2 inches; then sealing the milled surface with 1/2 inch asphalt chip seal, and resurfacing the roadway with 1-1/2 inches of hot mix asphalt. The following items may also be included as needed: milling and resurfacing side road approaches, full depth roadway repairs, adjusting granite curb, limited drainage structure repairs, replacing bit. conc. berm, placing dense graded crushed stone for shoulders, upgrading highway guard rail to current standards, placing new pavement markings and installing raised pavement markers. Installation of rumble strips in the roadway shoulders is also proposed.
Location:
  • Town of Cummington
  • Resident Engineer: Matthew Fillio
    Construction Contract Value: $6,171,527.00
    Construction Bid Price: $5,332,113.50
    Initial Construction Estimate: $6,131,185.52
    District: District 1

    Contracts (1) Progress
    # 80429 -- Construction Contract
    Resurfacing and Related Work along a Section of Routes 9 and 112 (Marine Corps League Highway). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 05/21/2014
    Contract Information
    Project Designer: In-House Boston
    Funding Source: NATIONAL HIGHWAY SYSTEM
    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 01/28/2009
    Project Initiation Form PIF Entered 01/29/2009
    Project Initiation Form PRC Submitted 02/04/2009
    Project Review Committee PRC Approved 02/12/2009
    Project Review Committee Letter 02/13/2009
    Project Status Advertised 11/02/2013
    Project Management
    100% Design 100% Package Received 06/04/2013
    100% Design 100% Package Comments to DE 06/21/2013
    25% Design 25% Package Received 07/02/2009
    25% Design 25% Package Comments to DE 07/10/2009
    75% Design 75% Package Received 07/02/2009
    75% Design 75% Package Comments to DE 07/10/2009
    Final Design PS&E Received 06/04/2013
    Final Design PS&E Received 07/10/2013
    Final Design PS&E Received 09/27/2013
    Final Design PS&E to FAPRO 10/03/2013