Project Description:
STURBRIDGE- HOLLAND- INTERSTATE MAINTENANCE & RELATED WORK ON I-84
This project consists of resurfacing I-84 in Holland and Sturbridge. The total length of this project is approximately 7.5 miles and includes the ramps at Exits 1, 2, and 3. The work consists of micromilling and resurfacing the mainline, bridge decks, and ramps; partial-depth and full-depth bridge deck repairs; bridge joint repairs; clearing and grubbing; adjusting, rebuilding, and remodeling drainage structures; replacing frames and grates with hook-lock frames and grates; resetting granite edging, granite curbing, and granite curb inlets; replacing HMA berm; resetting guardrail; replacing traffic data collection stations; stormwater improvements; and installing recessed polyurea pavement markings throughout the project.
Location:
  • Town of Holland
  • Town of Sturbridge
  • Construction Begins: Winter 2016/2017
    Resident Engineer: Stanley Choinski
    Construction Bid Price: $14,754,794.99
    District: District 3

    Contracts (1) Progress
    # 94804 -- Construction Contract
    Resurfacing and Related Work and Drainage Improvements along a Section of Interstate 84 Completed

    Bridges

    Contract Dates
    Notice to Proceed: 02/02/2017
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Interstate Maintenance
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 01/30/2009
    Project Need Form PNF Approved 02/09/2009
    Project Initiation Form PIF Entered 02/10/2009
    Project Initiation Form PRC Submitted 02/10/2009
    Project Review Committee PRC Approved 02/12/2009
    Project Review Committee Letter 02/19/2009
    Project Status Advertised 06/11/2016
    Project Management
    100% Design 100% Package Received 04/28/2016
    100% Design 100% Package Comments to DE 05/09/2016
    25% Design 25% Package Received 06/08/2015
    75% Design 75% Package Received 06/08/2015
    75% Design 75% Package Comments to DE 06/24/2015
    Final Design PS&E Received 04/28/2016
    Final Design Peer Review Comments to DE 06/27/2016
    Final Design PS&E to FAPRO 06/06/2016