Project Description: |
LYNNFIELD- WAKEFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-95
The project will resurface I-95 in Lynnfield and Wakefield from MM 56.6 to MM 60.9 for a total project length of 4.30 miles.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Joseph Pavao Jr![]() |
Estimated Total Contract Cost: | $12,368,312.40 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|