| Project Description: |
WEYMOUTH- RESURFACING & RELATED WORK ON ROUTE 3
The project will resurface Route 3 in Weymouth from MM 36.0 to 38.0 for a total project length of 2 miles.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Eric I Nova![]() |
| Estimated Total Contract Cost: | $2,961,698.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|