NORTHBOROUGH- RESURFACING & RELATED WORK ON ROUTE 20, FROM 20 FEET NORTH OF TOMBLIN HILL ROAD TO THE MARLBOROUGH TOWN LINE.
Resurfacing and related work on a section of Route 20 from MM 121.6 to 126.2 for a total project length of 4.6 miles.
|
| Location: |
|
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Lyris Liautaud![]() |
| Estimated Total Contract Cost: | $3,807,621.98 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|