Project Description:
|
BECKET- RESURFACING & RELATED WORK ON ROUTE 20, FROM MM 25.73 TO MM 30.94
Proposed work consists of micro-milling the roadway to an average depth of 2", sealing the milled surface with 1/2" of asphalt chip seal, and resurfacing the roadway with 1-1/2" of hot mix asphalt. The following items may also be included at select locations, as needed: milling and resurfacing side road approaches, full depth roadway repairs, repaving driveway aprons, adjusting granite curb, limited drainage structure repairs, reconstructing sidewalks for ADA compliance, replacing bit. conc. berm, placing dense graded crushed stone for shoulders, upgrading highway guard rail to current standards, placing new pavement markings and installing raised pavement markers.
|