Project Description: |
BOSTON- COMMUNICATION EQUIPMENT INSTALLATION AT 5 LOCATIONS (ITS) & FIBER OPTIC CONNECTIONS WITHIN EXISTING CONDUIT AT 4 LOCATIONS
The design of communication equipment at five locations to increase bandwidth and allow for single Closed Circuit TV connections for viewing for the City of Boston.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Michelle Boucher![]() |
Estimated Total Contract Cost: | $355,157.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|