MARSHFIELD- RESURFACING & RELATED WORK ON ROUTE 3A
Work proposed for this project includes mill and overlay of Route 3A in the town of Marshfield. Also included will be the reconstruction of eroded shoulders at the roadway edge, the adjusting or rebuilding of existing drainage structures, and other related work.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Eamon Kernan![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||