Project Description: |
NORTH ANDOVER- TRAFFIC SIGNAL BETTERMENT @ 8 LOCATIONS ALONG ROUTE 125
In North Andover, the project will remove existing traffic signal equipment and install new signal equipment at the following intersections on Route 125: Route 133, Sutton Street, Prescott Street, Walker Street, Main Street, Massachusetts Avenue. The project will also add a pedestrian crossing south of Village Green Drive and Peters Street/Andover Street.
|
Location: |
|
Resident Engineer: | Robert Blackmar |
Construction Contract Value: | $774,916.00 |
Construction Bid Price: | $640,833.00 |
Initial Construction Estimate: | $765,175.00 |
District: | District 4 |
|
Bridges |
|
|
|
|