SALISBURY- TRAFFIC SIGNAL BETTERMENTS AT 4 LOCATIONS
The work under this contract includes the reconstruction of four existing traffic control signal systems at the following locations in Salisbury; Lafayette Street (Route 1) at Forest Road/Collins Road; Main Street at High Street/Willow Street; Route 1 Connector at Main Street (Route 286); Route 1 Connector at Forest Street. The work includes the installation of new conduit, wiring, signal posts and mast arms, signal housings, controller cabinets, video and loop detection, emergency vehicle pre-emption, signs and pavement markings, and minor grading and drainage improvements.
Location:
  • Town of Salisbury
  • Resident Engineer: Paul Cameron
    Construction Contract Value: $716,259.00
    Construction Bid Price: $587,508.25
    Initial Construction Estimate: $872,020.00
    District: District 4

    Contracts (2) Progress
    # 56170 -- Design -- Traffic Signing/Signals
    Work will consist of providing traffic engineering services in connection with the improvement to state owned traffic signals, sign and pavement marking systems. Final
    # 75717 -- Construction Contract
    Traffic Signal Improvements at 4 Intersections. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/11/2013
    Contract Information
    Project Designer: Consultant
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 07/02/2009
    Project Initiation Form PIF Entered 07/02/2009
    Project Initiation Form PRC Submitted 07/02/2009
    Project Review Committee PRC Approved 08/13/2009
    Project Review Committee Letter 09/03/2009
    Project Status Advertised 09/22/2012
    Project Management
    Final Design PS&E Received 09/21/2009
    Final Design PS&E Received 09/14/2012
    Final Design PS&E to FAPRO 05/15/2012
    Final Design PS&E to FAPRO 09/14/2012