Project Description:
ARLINGTON- RECONSTRUCTION ON FOREST STREET, FROM WINCHESTER T.L. TO SUMMER STREET
The project will reconstruct Forest Street from the Winchester Town Line to Summer Street. The reconstruction of the corridor will include: pavement reconstruction, upgrade of the existing closed drainage system, consistent edge treatments including granite curbing, sidewalk reconstruction, and the provision of accessible curb cuts.
Location:
  • Town of Arlington
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Project Manager: Michael-kosmas Bloukos
    Estimated Total Contract Cost: $1,501,467.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project