Project Description:
HOLDEN- WEST BOYLSTON- FURNISHING & INSTALLATION OF A SAFETY FENCE AND BRIDGE JOINT REPAIRS ON H-18-029=W-17-027, I-190 OVER QUINAPOXET RIVER
The work under this contract consists of furnishing and installing a safety protective fence, replacing the bridge joint seals, replacing bridge joints assemblies, extension of downspouts and cleaning of bridge scuppers, drainage lines and drainage structures. The contractor will also be required to clean and patch the concrete deterioration in the existing bridge parapet.
Location:
  • Town of Holden
  • Town of West Boylston
  • Design Responsibility: In-House Boston
    Project Manager: Richard Rush
    Estimated Total Contract Cost: $1,423,805.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • H18029 
    • W17027 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project