| Project Description: |
HOPKINTON- DECK REPLACEMENT, H-23-012, I-90 RAMP OVER I-495
The work shall consist of reconstructing the deck and approach wearing surface; upgrading the bridge rail, bridge transition; upgrading the approach guard rail; replacement of deck joints at the abutments and eliminating/replacing joints over the piers. The work will also include repairing concrete deterioration at existing abutment seats; repairing the deterioration at the piers; cleaning and painting of all structural steel.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Alwin Ramirez![]() |
| Estimated Total Contract Cost: | $4,179,742.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|