Project Description: |
BERNARDSTON- CULVERT REPLACEMENT, B-10-026, ROUTE 5 & 10 OVER TRIBUTARY OF THE FALL RIVER
The purpose of this project is to replace a 4'x6' concrete box culvert in Bernadston at Route 5 & 10. The culvert was planned to be repaired and extended under Project File# 602241 which was advertised in 2007. By the time of construction, the deterioration at the water line was determined to be so extensive that full replacement is now recommended.
|
Location: |
|
Resident Engineer: | Victor LaMountain |
Construction Contract Value: | $397,686.00 |
Construction Bid Price: | $334,715.40 |
Initial Construction Estimate: | $278,819.00 |
District: | District 2 |
|