Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
NEW BEDFORD- MULTIMODAL (LANDSIDE & WATERSIDE) POWER ELECTRIFICATION FOR COMMERCIAL FISHING PIERS
The proposed project consists of the multimodal power electrification (landside and waterside) of Fisherman’s Wharf in New Bedford Harbor. The power electrification will be available on the commercial fishing pier for multimodal transportation use including commercial boats and trucks. The improvements will include the following: • Location 1- Fisherman’s Wharf: The work at this location includes the installation of a transformer vault, construction of an electrical system network for power distribution to various pedestal outlets, and installation of nine (9) electrical pedestals equipped with receptacles for landside and waterside use. • Location 2- Homer’s Wharf: The work at this location includes the installation of a precast concrete switchgear vault, and construction of an electrical system network to furnish power from an existing NSTAR electric manhole to the switchgear vault.
Location:
  • City of New Bedford
  • Resident Engineer: Kenneth Charlton
    Construction Contract Value: $611,012.00
    Construction Bid Price: $535,957.00
    Initial Construction Estimate: $584,575.00
    District: District 5

    Contracts (1) Progress
    # 70379 -- Construction Contract
    Multimodal (Landside and Waterside) Power Electrification for Commercial Fishing Piers Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 10/18/2011
    Contract Information
    Project Designer: Municipality
    Funding Source: CONGESTION MIT. AIR QUAL.
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/21/2009
    Project Initiation Form PIF Entered 07/21/2010
    Project Initiation Form PRC Submitted 07/21/2010
    Project Review Committee PRC Approved 08/12/2010
    Project Status Advertised 08/06/2011
    Project Management
    100% Design 100% Package Received 05/12/2011
    100% Design 100% Package Comments to DE 06/16/2011
    25% Design 25% Package Received 12/22/2010
    25% Design 25% Package Comments to DE 01/25/2011
    25% Design Design Public Hearing 03/31/2011
    75% Design 75% Package Received 05/12/2011
    Final Design PS&E Received 07/22/2011
    Final Design PS&E to FAPRO 07/27/2011