SPRINGFIELD- LIGHTING UPGRADES ON ROUTE I-91, FROM THE SOUTH END BRIDGE (ROUTE 5) TO STATE STREET
A lighting upgrade is required at this location due to the inadequacy of the existing system. This work will complete lighting upgrades from the Connecticut state line to the southerly limit of the viaduct section in Springfield. This short section of I-91 was not included under the previous lighting project (#600583 Longmeadow/Springfield completed July 2006) due to conflicts with another major project (Springfield I-91 weave elimination 602965 completed September 2006). The work will include new high-mast lighting standards, foundations, handholds, conduits and wires along the I-91 Median.
Location:
  • City of Springfield
  • Resident Engineer: Daniel Boucher
    Construction Contract Value: $883,076.00
    Construction Bid Price: $784,410.00
    Initial Construction Estimate: $717,719.82
    District: District 2

    Contracts (2) Progress
    # 53746 -- Design -- Traffic Signing/Signals
    Work will consist of providing engineering services in connection with the design, modification and rehabilitation of the Statewide Highway Lighting System. Final
    # 67600 -- Construction Contract
    Highway Lighting Installation on a Section of Interstate 91 Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/10/2011
    Contract Information
    Project Designer: Consultant
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/31/2009
    Project Initiation Form PIF Entered 08/31/2009
    Project Initiation Form PRC Submitted 08/31/2009
    Project Review Committee PRC Approved 10/30/2009
    Project Review Committee Letter 10/30/2009
    Project Status Advertised 09/11/2010
    Project Management
    100% Design 100% Package Received 02/23/2010
    100% Design 100% Package Received 09/01/2010
    25% Design 25% Package Received 10/29/2009