WESTHAMPTON- RESURFACING & RELATED WORK ON ROUTE 66
Work for the Route 66 Resurfacing project in Westhampton will consist of milling 2 inches from the existing paved surface and resurfacing with 2 inches of hot mix asphalt pavement course modified top. Work will also include replacing signs as needed, repairing hot mix asphalt berm and new pavement markings. The project limits are as follows: Route 66 from the Huntington town line to the Northampton town line (MM 3.10 to MM 7.64), for a project length of 4.54 miles.
Location:
  • Town of Westhampton
  • Resident Engineer: Nicholas Corey
    Construction Contract Value: $1,255,268.00
    Construction Bid Price: $1,063,334.75
    Initial Construction Estimate: $1,152,503.00
    District: District 2

    Contracts (1) Progress
    # 75719 -- Construction Contract
    Roadway Reconstruction and Related Work on a Section of Route 66 (Main Road). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 01/25/2013
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/31/2009
    Project Initiation Form PIF Entered 08/31/2009
    Project Initiation Form PRC Submitted 09/21/2009
    Project Review Committee PRC Approved 10/30/2009
    Project Review Committee Letter 10/30/2009
    Project Status Advertised 09/22/2012
    Project Management
    75% Design 75% Package Received 12/08/2009
    Final Design PS&E Received 03/09/2010
    Final Design PS&E Received 07/07/2010
    Final Design PS&E Received 02/23/2011
    Final Design PS&E Received 02/08/2012
    Final Design PS&E Received 08/27/2012
    Final Design PS&E to FAPRO 04/26/2012
    Final Design PS&E to FAPRO 09/11/2012