WESTHAMPTON- RESURFACING & RELATED WORK ON ROUTE 66
Work for the Route 66 Resurfacing project in Westhampton will consist of milling 2 inches from the existing paved surface and resurfacing with 2 inches of hot mix asphalt pavement course modified top. Work will also include replacing signs as needed, repairing hot mix asphalt berm and new pavement markings. The project limits are as follows: Route 66 from the Huntington town line to the Northampton town line (MM 3.10 to MM 7.64), for a project length of 4.54 miles.
|