Project Description: |
BOSTON- BYPASS PUMP SYSTEM INSTALLATION ALONG I-90
The purpose of this project is to install pipe, ancillary equipment and pumps to provide a back-up system for an existing storm water pipe that is settling.
|
Location: |
|
Construction Begins: | Winter 2009/2010 |
Resident Engineer: | Joseph Coleman |
Construction Contract Value: | $1,271,600.00 |
Construction Bid Price: | $1,156,000.00 |
Initial Construction Estimate: | $1,230,340.00 |
District: | District 4 |
|
Bridges |
|
|
|
|