| Project Description: |
BOSTON- BYPASS PUMP SYSTEM INSTALLATION ALONG I-90
The purpose of this project is to install pipe, ancillary equipment and pumps to provide a back-up system for an existing storm water pipe that is settling.
|
| Location: |
|
| Construction Begins: | Winter 2009/2010 |
| Resident Engineer: | Joseph Coleman![]() |
| Construction Contract Value: | $1,271,600.00 |
| Construction Bid Price: | $1,156,000.00 |
| Initial Construction Estimate: | $1,230,340.00 |
| District: | District 4 |
|