PETERSHAM- RESURFACING & RELATED WORK ON ROUTE 32, FROM BARRE T.L. TO 1 MILE NORTH OF ROUTE 101
The project consists of pavement milling and resurfacing and related work on a section of Route 32 in Petersham. The project begins at Route 32 Mile Marker 39.023 at the Petersham/Barre Town Line and continues to Mile Marker 44.900. Bridge P-08-001(190) over the Swift River Branch has been recently reconstructed and the limits of that project, from MM 40.225 to MM 40.342, are not included in this resurfacing project. The total length of the project is 5.88 miles. The work will be done in two sections: Section 1 from the Barre line to Rt. 101 will be milled 2" and resurfaced with 2" of hot mix asphalt; Section 2 from Rt. 101 to MM 44.900 will be milled 3" and resurfaced with a 2" HMA intermediate course and a 2" HMA top course. Existing subdrain in Section 2 will be replaced. Related work on the project will include adjusting, rebuilding, and cleaning drainage structures; removing and resetting edging, curb, and curb inlets; replacing hot mix asphalt berm; installing new guardrail end treatments; installing, removing, and resetting guardrail; grading, compacting, and filling shoulders; constructing wheelchair ramps; installing pavement markings; installing recessed pavement markers; installing construction traffic management devices; and erosion & sedimentation control.
Location:
  • Town of Petersham
  • Resident Engineer: Matthew Minihan
    Construction Contract Value: $2,290,386.00
    Construction Bid Price: $1,932,010.70
    Initial Construction Estimate: $2,365,278.00
    District: District 2

    Contracts (1) Progress
    # 66335 -- Construction Contract
    Resurfacing and Related Work on a Section of Route 32. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 11/17/2010
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/28/2009
    Project Initiation Form PIF Entered 09/29/2009
    Project Initiation Form PRC Submitted 10/23/2009
    Project Review Committee PRC Approved 10/30/2009
    Project Review Committee Letter 10/30/2009
    Project Status Advertised 06/26/2010
    Project Management
    75% Design 75% Package Received 11/19/2009
    75% Design 75% Package Comments to DE 11/24/2009
    Final Design PS&E Received 01/04/2010
    Final Design PS&E Received 06/04/2010
    Final Design PS&E Received 06/17/2010
    Final Design PS&E to FAPRO 06/18/2010