| Project Description: |
CHARLEMONT- CULVERT REPLACEMENT, C-05-016 & C-05-017, MOHAWK TRAIL (ROUTE 2) OVER OXBOW BROOK AND WILDER BROOK
Existing culverts will be replaced by CIP rigid frames. One lane of traffic will be maintained. Stage construction will be required. LRFD Code will be used for design.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | David Shedd![]() |
| Estimated Total Contract Cost: | $1,776,939.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||