CANTON- SAFE ROUTES TO SCHOOL (HANSEN SCHOOL)
The project includes reconstructing and widening existing sidewalks on Pecunit Street and Kenney Street, installing new sidewalk on Pecunit Street near Charles Drive, reconfiguring the existing school parking lot on Pecunit Street, installing wheel chair ramps, crosswalks and installing a flashing pedestrian warning assembly on Washington Street.
Location:
  • Town of Canton
  • Resident Engineer: Gene Lee
    Construction Contract Value: $641,534.00
    Construction Bid Price: $569,772.00
    Initial Construction Estimate: $558,187.50
    District: District 6

    Contracts (2) Progress
    # 64315 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 70649 -- Construction Contract
    Sidewalk Reconstruction and Related Work on a Sections of Pecunit, Washington and Kenney Streets (Safe Routes to Hansen School). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 12/20/2011
    Contract Information
    Project Designer: Consultant
    Funding Source: Safe Routes to Schools
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/15/2009
    Project Initiation Form PIF Entered 10/15/2009
    Project Initiation Form PRC Submitted 10/19/2009
    Project Review Committee PRC Approved 10/30/2009
    Project Review Committee Letter 10/30/2009
    Project Status Advertised 08/20/2011
    Project Management
    100% Design 100% Package Received 02/08/2011
    100% Design 100% Package Comments to DE 04/04/2011
    25% Design 25% Package Received 05/18/2010
    25% Design Design Public Hearing 12/08/2010
    75% Design 75% Package Received 05/18/2010
    75% Design 75% Package Comments to DE 08/20/2010
    Final Design PS&E Received 07/01/2011
    Final Design PS&E to FAPRO 08/17/2011
    Consultant Contract Process NTP Issued 12/09/2009