Project Description: |
STONEHAM- SAFE ROUTES TO SCHOOL (CENTRAL SCHOOL)
The existing sidewalk on Central Street will be reconstructed. The school entrance will be improved by adding new crosswalk signs and pavement markings to control traffic flow and provide a fire lane. A new sidewalk will be installed along the school exit driveway. The school exit drive will be reconstructed to provide a multi-use path and vehicle egress.
|
Location: |
|
Resident Engineer: | Michael Bartolo |
Construction Contract Value: | $359,050.25 |
Construction Bid Price: | $322,246.05 |
Initial Construction Estimate: | $382,575.00 |
District: | District 4 |
|
Bridges |
|
|
|
|