Project Description:
MIDDLEBOROUGH- NEMASKET RIVER STORMWATER POLLUTION MITIGATION
The purpose of this project is to mitigate pollution in at five locations along the Nemasket River. This includes four stormwater catchments – Mayflower Avenue, Pierce Playground, Spencer Street, and Rte 105/Sachem Street- where Best Management Practices (BMPs) will be installed to reduce the discharge of pollutants to the Nemasket River. The fifth location includes reconstruction of a concrete block retaining wall at the Nemasket River Fish Ladder, which is currently eroding and collapsing into the river.
Location:
  • Town of Middleborough
  • Resident Engineer: Kenneth Belgrave
    Construction Contract Value: $659,158.00
    Construction Bid Price: $594,689.50
    Initial Construction Estimate: $624,000.00
    District: District 5

    Contracts (2) Progress
    # 64302 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 70928 -- Construction Contract
    Drainage Mitigation and Improvements at Mayflower Avenue, East Main and Spencer Streets adjacent to the Nemasket River. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 02/10/2012
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/15/2009
    Project Initiation Form PIF Entered 10/20/2009
    Project Initiation Form PRC Submitted 10/20/2009
    Project Review Committee PRC Approved 10/30/2009
    Project Review Committee Letter 10/30/2009
    Project Status Advertised 09/03/2011
    Project Management
    100% Design 100% Package Received 05/27/2011
    100% Design 100% Package Comments to DE 07/20/2011
    25% Design 25% Package Received 06/11/2010
    25% Design 25% Package Comments to DE 07/28/2010
    25% Design 25% Package Approved 01/12/2011
    25% Design Design Public Hearing 01/11/2011
    Final Design PS&E Received 08/31/2011
    Final Design PS&E to FAPRO 08/31/2011