BUCKLAND- SHELBURNE- BRIDGE PRESERVATION, B-28-022=S-11-001, ROUTE 2A (BRIDGE STREET) OVER DEERFIELD RIVER
The work for the bridge carrying Route 2a over the Deerfield River in Buckland consists of removal and replacement of the 3/8” Flexogrid wearing surfac, installing new wearing surface on sidewalk; reconstructing the bridge approach pavement; providing new approach sidewalk; repairing the deep spall in the deck or at the deck joints and removing all sand; cleaning and/or repairing floorbeams sidewalk brackets that have corrosion crack or section loss; cleaning and/or repairing (heat straightening steel where required) all structural steel elements including railing with impact damage, missing lattice, loose fasteners and truss members lower chord (web & flange) that have section loss, corrosion holes, or collision damage; replacing all missing/broken fasteners from the lateral bracing; removing either from the bridge seat or the scuppers all sand and debris or vegetation growth; patching all cracks in the pier caps. Approach work shall consist of milling and paving approximately 100’ on either side of the bridge. All approach railing and terminal ends shall be upgraded as per latest standard.
Location:
  • Town of Buckland
  • Town of Shelburne
  • Design Responsibility: Consultant
    Project Manager: Alyson Bedard
    Estimated Total Contract Cost: $1,010,000.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/19/2009
    Project Initiation Form PIF Entered 10/19/2009
    Project Initiation Form PRC Submitted 10/19/2009
    Project Review Committee PRC Approved 10/30/2009
    Project Review Committee Letter 10/30/2009