Project Description: |
LONGMEADOW- RESURFACING & RELATED WORK ON ROUTE 5 (LONGMEADOW STREET), FROM EDGEWOOD STREET TO WARREN TERRACE, INCLUDES CULVERT REPAIRS AT COOLEY BROOK
Project includes resurfacing and roadway drainage system improvements from Edgewood Street northerly to Warren Terrace. Work will also include lining of the existing 4'x4' box culvert at Cooley Brook along with new headwalls and slope repairs at both culvert ends.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Project Manager: | German Nieto![]() |
Estimated Total Contract Cost: | $935,977.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|