Project Description: |
SHEFFIELD- GREAT BARRINGTON- RESURFACING & RELATED WORK ON ROUTE 7 (MM 0.0 TO MM 9.38)
This project proposes to use appropriate pavement preservation measures to improve rideability and preserve pavement integrity on Route 7 from MM 0.0 in Sheffield (CT State line) to MM 9.38 in Great Barrington. Other incidental work may also be included; but no work is proposed beyond the limits of the guard rail. The project also includes installation of rumble strips in the roadway shoulders.
|
Location: |
|
Resident Engineer: | Daniel Evans |
Construction Contract Value: | $6,598,307.56 |
Construction Bid Price: | $5,451,907.30 |
Initial Construction Estimate: | $5,363,000.00 |
District: | District 1 |
|
Bridges |
|
|
|
|