Project Description: |
SHEFFIELD- GREAT BARRINGTON- RESURFACING & RELATED WORK ON ROUTE 7 (MM 0.0 TO MM 9.38)
This project proposes to use appropriate pavement preservation measures to improve rideability and preserve pavement integrity on Route 7 from MM 0.0 in Sheffield (CT State line) to MM 9.38 in Great Barrington. Other incidental work may also be included; but no work is proposed beyond the limits of the guard rail. The project also includes installation of rumble strips in the roadway shoulders.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Lyris Liautaud |
Estimated Total Contract Cost: | $6,598,307.56 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|