Project Description:
SHEFFIELD- GREAT BARRINGTON- RESURFACING & RELATED WORK ON ROUTE 7 (MM 0.0 TO MM 9.38)
This project proposes to use appropriate pavement preservation measures to improve rideability and preserve pavement integrity on Route 7 from MM 0.0 in Sheffield (CT State line) to MM 9.38 in Great Barrington. Other incidental work may also be included; but no work is proposed beyond the limits of the guard rail. The project also includes installation of rumble strips in the roadway shoulders.
Location:
  • Town of Great Barrington
  • Town of Sheffield
  • Resident Engineer: Daniel Evans
    Construction Contract Value: $6,598,307.56
    Construction Bid Price: $5,451,907.30
    Initial Construction Estimate: $5,363,000.00
    District: District 1

    Contracts (1) Progress
    # 85582 -- Construction Contract
    Resurfacing and Related Work along a Section of Route 7 (Sheffield Plain, North, South and Main Streets). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/01/2016
    Contract Information
    Project Designer: In-House Boston
    Funding Source: NATIONAL HIGHWAY SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/20/2009
    Project Initiation Form PIF Entered 10/20/2009
    Project Initiation Form PRC Submitted 10/26/2009
    Project Review Committee PRC Approved 10/30/2009
    Project Review Committee Letter 10/30/2009
    Project Status Advertised 11/01/2014
    Project Management
    25% Design 25% Package Comments to DE 06/03/2014
    75% Design 75% Package Received 04/07/2014
    75% Design 75% Package Comments to DE 06/03/2014
    Final Design PS&E Received 07/29/2014
    Final Design PS&E Received 10/07/2014
    Final Design PS&E to FAPRO 10/20/2014