Project Description: |
DISTRICT 6- DRAWBRIDGE OPERATION, MAINTENANCE & REPAIR
THESE ARE MAINTENANCE CONTRACTS AND MUST BE IN PLACE ALL THE TIMES. CURRENT DRAWBRIDGE CONTRACT # 54173 EXPIRES ON APRIL 14, 2010 AND THE NEW CONTRACT MUST BE IN PLACE BEFORE THAT DATE.
|
Location: | |
Resident Engineer: | John Panagopoulos |
Construction Contract Value: | $8,609,680.32 |
Construction Bid Price: | $1,362,110.00 |
Initial Construction Estimate: | $1,457,900.00 |
District: | District 6 |
|
Bridges |
|
|
|
|