CHESTER- RETAINING WALL REPLACEMENT ALONG ROUTE 20
This project will replace an existing, failed, dry-laid stone retaining wall with a cast-in-place reinforced concrete retaining wall. The wall supports the highway (fill section), and is not visible from the roadway. The failed wall is approximately 30 ft long and 7 ft high, and lies between two sections of reinforced concrete retaining wall; the proposed wall will connect these two existing wall sections.
Location:
  • Town of Chester
  • Resident Engineer: Richard Miskinis Jr
    Construction Contract Value: $223,008.48
    Construction Bid Price: $189,834.00
    Initial Construction Estimate: $162,184.00
    District: District 1

    Contracts (1) Progress
    # 73647 -- Construction Contract
    Retaining Wall Replacement and Related Work on a Section of Route 20. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 08/29/2012
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/27/2009
    Project Initiation Form PIF Entered 10/27/2009
    Project Initiation Form PRC Submitted 10/27/2009
    Project Review Committee PRC Approved 10/30/2009
    Project Review Committee Letter 10/30/2009
    Project Status Advertised 05/19/2012
    Project Management
    75% Design 75% Package Received 07/28/2010
    Final Design PS&E Received 06/20/2011
    Final Design PS&E to FAPRO 03/27/2012