Project Description: |
AGAWAM- RESURFACING & RELATED WORK ON SR57, FROM ROUTE 187 TO ROUTE 75
Work for the Route 57 Resurfacing project in Agawam will consist of milling the existing paved surface and resurfacing with hot mix asphalt pavement course modified top. Work will also include replacing signs as needed, repairing hot mix asphalt berm and new pavement markings. The project limits are as follows: Route 57 from Route 187 to Route 75 (MM 40.35 to MM 43.28), for a project length of 2.93 miles.
|
Location: |
|
Resident Engineer: | Thomas Doody |
Construction Contract Value: | $2,371,716.00 |
Construction Bid Price: | $2,042,569.85 |
Initial Construction Estimate: | $2,482,817.00 |
District: | District 2 |
|
Bridges |
|
|
|
|