GREENFIELD- RESURFACING & RELATED WORK ON ROUTE 2, FROM INTERSTATE 91 TO WEST OF THE GREENFIELD GILL T.L. (2.6 MILES)
Work for the Route 2 resurfacing project in Greenfield will consist of milling the existing paved surface and resurfacing with hot mix asphalt pavement course modified top. Work will also include repairing hot mix asphalt berm, repairing guardrail as needed, and new pavement markings. The project limits are as follows: Route 2 from Interstate 91 to the Gill town line at the Falls River (MM 49.93 to MM 52.79), for a project length of 2.86 miles.
|