ATHOL- PETERSHAM- RESURFACING & RELATED WORK ON ROUTE 32, FROM 1 MILE NORTH OF ROUTE 101 TO ROUTE 2/ROUTE 32 BRIDGE
Work for the Route 32 Resurfacing project in Athol and Petersham will consist of milling the existing paved surface and resurfacing with hot mix asphalt pavement course modified top. Work will also include replacing subdrains, replacing or repairing other drainage structures as needed, replacing signs and guardrail as needed, repairing hot mix asphalt berm, repairing granite curb and edging, and applying new pavement markings. The project limits are as follows: Route 32 from one mile north of Popple Camp Road (Route 101) in Petersham to the Route 2/Route 32 bridge in Athol (MM 44.900 to MM 48.773). The project limits include the eastbound access ramps to Route 2/202 for a distance of approximately 150 feet.
Location:
  • Town of Athol
  • Town of Petersham
  • Resident Engineer: Matthew Fuller
    Construction Contract Value: $2,464,033.00
    Construction Bid Price: $2,184,694.25
    Initial Construction Estimate: $2,343,871.00
    District: District 2

    Contracts (1) Progress
    # 75948 -- Construction Contract
    Resurfacing and Related Work (Including Sidewalks) on a Section of Route 32 (Petershame Road) and the Route 2 EB Ramps. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/01/2013
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 12/29/2009
    Project Initiation Form PIF Entered 12/29/2009
    Project Initiation Form PRC Submitted 01/13/2010
    Project Review Committee PRC Approved 02/11/2010
    Project Review Committee Letter 04/05/2010
    Project Status Advertised 10/13/2012
    Project Management
    100% Design 100% Package Received 06/20/2012
    100% Design 100% Package Comments to DE 07/09/2012
    75% Design 75% Package Received 02/26/2010
    75% Design 75% Package Comments to DE 10/21/2011
    Final Design PS&E Received 08/09/2012
    Final Design PS&E to FAPRO 08/15/2012