Project Description:
|
DEERFIELD- WHATELY- RESURFACING & RELATED WORK ON ROUTES 5 &10, FROM OLD STATE ROAD TO CONWAY ROAD (1.1 MILES)
Work for the Routes 5 and 10 Resurfacing project in Whately and Deerfield will consist of milling the existing paved surface and resurfacing with hot mix asphalt pavement course modified top. Work will also include new sidewalks, crosswalks and ped signals at Elm Street, replacing signs and guardrail as needed, repairing hot mix asphalt berm, and new pavement markings. The project limits are as follows: Route 5&10 from 500' south of Old State Road in Whately to North Hillside Road in Deerfield, MM 33.21 to MM 36.71, for a project length of 3.50 miles.
|