Project Description: |
DOUGLAS- NORTHBRIDGE- SUTTON- UXBRIDGE- RESURFACING & RELATED WORK ON ROUTE 146 (NB)
Route 146 Northbound will be resurfaced from a pavement joint, located just north of Mill Street in Uxbridge, northerly to a pavement joint, located just south of Boston Road in Sutton. The total project length is approximately 10 miles.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Jessica E Stanley |
Estimated Total Contract Cost: | $8,583,110.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project has been advertised for construction bids. (as of 06/26/2010 ) |
|