FREETOWN- BRIDGE REPLACEMENT, F-09-010, N. MAIN STREET OVER ST 24
The purpose of this project is to replace the bridge with a new one. The new bridge will consist of a 2-span continuous superstructure with a new substructure. The new substructure will include a new aesthetic pier. A full closure and detour will be required to construct the project.
Location:
  • Town of Freetown
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Janhavi Limaye
    Estimated Total Federal Participating Construction Cost: N/A
    Funding Provision: This project is planned to be funded through the 2028 Transportation Improvement Program for the Southeastern Massachusetts Metropolitan Planning Organization.
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • F09010 
    See the Milestone Details tab for additional Project information
    Planned Federal FY: 2028
    Responsible MPO: Southeastern Massachusetts Metropolitan Planning Organization
    Location: Municipality
    Cities: FREETOWN
    Category: Advertised Projects Constr.
    Budget Section: 3B
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Next Generation Bridge GANs
    Federal Cost: $22,384,935.20
    State Cost: $5,596,233.80
    Total Cost: $27,981,169.00