Project Description: |
DISTRICT 6- SCHEDULED & EMERGENCY STRUCTURAL & SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS
Work will be assigned, as needed, throughout the life of the contract.
|
Location: | |
Resident Engineer: | Gene Lee |
Construction Bid Price: | $6,354,233.00 |
Initial Construction Estimate: | $6,926,345.00 |
District: | District 6 |
|
Bridges
|
|
|
|
|